The CAN-ductor is one joint of conductor integrated within the body of the CAN-basic. As with all CAN solutions, it is built at our workshop to be installed by a vessel ahead of rig arrival. The CAN-ductor includes all the features of the CAN-basic with even more cost savings and risk mitigation.
FEATURES & BENEFITS
nPre-rig well construction
nUnrivalled ability for shallow kick-off
nIndependent of rig schedule to save rig time
nVerified load capacity
nSimplified P&A operations saves 2-4 days
nEasy integration of protection structures and flow lines
nVerified inclination
APPLICATIONS
nExploration wells:Our CAN solutions are ideal for exploration since the conductor is recovered with the CAN it is only necessary to cut the surface casing, making P&A operations far more efficient.
nProduction wells:CAN technology reduces project execution time for production wells. Savings per well are generated from pre-rig well construction and pre-mounted equipment.