Gas Hydrate Exploration
  • 1
  • MFG: PAG
  • ORIGIN: CHINA / NORWAY

Detailed Information

PAG has two solutions for Gas Hydrate Exploration

GH Riser System from Drillship

- Depletion of GH reservoir using the CML controlled mud level method

- Riser connected to vessel for drilling and testing of GH well

- Rig BOP used for well control

内容 01 300 880.jpg

GH Riserless System from Smaller Surface Vessel with Derrick

- No riser used

- Depletion by ESP in GH well

内容 02 300 880.jpg

PAG has the CAN Template to be used for both system solutions

The CAN Template will significantly reduce the risk for failure for the drilling and testing of the shallow deviated gas hydrate 

well

内容 03 300 880.jpg