PAG has two solutions for Gas Hydrate Exploration
GH Riser System from Drillship
- Depletion of GH reservoir using the CML controlled mud level method
- Riser connected to vessel for drilling and testing of GH well
- Rig BOP used for well control
GH Riserless System from Smaller Surface Vessel with Derrick
- No riser used
- Depletion by ESP in GH well
PAG has the CAN Template to be used for both system solutions
The CAN Template will significantly reduce the risk for failure for the drilling and testing of the shallow deviated gas hydrate
well